Ramagundam fertilizer factory possible with KCR vison: Nirajan Reddy

Hyderabad ,June 14::State Agriculture Minister Singirareddi Niranjan Reddy ordered that the construction of the Ramagundam fertilizer factory to be investigate with the authorities and to complete the work as soon as possible.

Nirajan Reddy praised chief minister k.chandra shekar Rao Past glory of Ramagundum was possible with KCR vision and mission

3850 metric tonnes of urea per day and 2200 metric tonnes of ammonia will produce everyday he said
Minister said that at a cost of Rs 6,120 crore investing Rebuilding of Fertilizer Factory by Chief Minister KCR

Nirajan Reddy said to be It is possible to get 50% of the urea required by the state from here
He said that 99 per cent of construction and missionary work was completed, and soon fertilizer production will begins he added

Special reservoir for industrial water needs, electrification work completed in month of April, Gas supply arrangements completed in last year month of November

Problems with Corona disaster to begin in June production is starting in the month of September
And also said that We are continuing the work on the product launch soon minster said

He said to be Fertilizer factory available with Ramagundam plant reconstruction Reduced transportation costs, employment opportunities locally provinding
He assured.

Blood donation camp held at Ramagundam, inauguration of blood donation camp in Ramagundam, Minister of Agriculture, Koppula Eshwer Dasari Manohar Reddy and other leaders were participated in this programme

Spread the love
Ad Widget

Recommended For You

About the Author: JournalistEye

Leave a Reply

Your email address will not be published. Required fields are marked *